Planning/Diane Beck WCGH ANNEX/CASS/DEP Non Compliance

5/25/13 Update The Planning/DEP fraud with the construction of the Captain Albert Stevens School aka CASS, is the biggest corruption catastrophe that needs its own blog. It is the final forcing of illegal runoff that has slaughtered resident properties in Wayne Marshall's path. At perception, residents demanded run off accountability. Never to happen with the DEP giving the gold seal of corruption. 3 years ago when my property got slaughter in Wayne' runoff and slammed the door in my face, I went to the people for information. Corruption of Planning and CASS was the word. Proving through public information that Wayne is now vaulting in his office is one never ending bad nightmare. Council, City Manager, Mayor, and City Attorney chain link together to and smash, smash, smash your soul and rob years of your life. One resident, actively and professionally (a contractor, major land owner, respected citizen and VET- basically one strong mass of integrity) with several of the same families also in Wayne's path, covered every aspect in protecting their property from Wayne's runoff. This resident told me that after 3 years of "head-banging" and files of letters to the City, DEP, Army Corp of Engineers, and on and on, the following. A storm water/run off impact analysis for the watershed residents. That would encompass Miller St. across the CASS site to Rte 1 and all the way down from Miller and Rte 1 to the bay. The analysis funded by the developments contributing to the path. The funds were collected, THE STUDY WAS NEVER DONE- JOE SLOCUM, CITY MANAGER REFUSES TO "SPECULATE" WHY AND WILL NOT IMPLEMENT STUDY NOW. THE STATUTE FOR THIS STUDY MAY BE THIS SEPTEMBER 2013!!! THE SCHOOL WAS BUILT AND NOT IN COMPLIANCE. The million dollar improvements done to Miller St. to handle runoff is NOT getting the CASS runoff. Wayne had them dig deeper on the lower end of area behind the Sweetser School so all the run off pours out to us through that illegal exit. The runoff should be draining at the center exit near the access road. The improvements- banking clearly visible and built to handle the runoff and take it to the Miller St million dollar sewers.. Only it is not- that exit is much higher, chances of runoff meeting that mark are next to NADA . It took me 2 years to get the DEP to do a fraudulent investigation. Tom Gilbert, DEP would not let me attend the investigation, I told him specifically where the illegal exit was and he failed to report it. Commissioner Aho and the Attorney General's office closed the investigation after I demanded accountability. The only runoff that was to come to the watershed residents was the change of plans with the Robertson School. Originally it was slated in the plans for demolition. Years later, here comes the squeeze that Wayne is infamous for. The school would not be demolished and only the runoff from the impervious grounds of the ROBERSTON NOW SWEETSER was to go to the residents. But only upon approval AFTER THE STORM WATER IMPACT STUDY WAS DONE. After I was tortured by being forced to view the CASS files in the Planning Office, under supervision for 6 hours- every shred of storm water/run off documents were missing. Wayne stating there were none. A surprise visit days later to review the same files were filled with a bonanza of stormwater/ runoff documents, emails, resident concerns, DEP, Army Corp., engineer reports, etc. Knowing I would never get those documents (Wayne and his posse were not in the office) I asked Marie for a copy of a few key documents, including the ordering of the IMPACT STUDY by WBRC engineers. The Impact Study was never done and runoff coming to residents from the whole damn CASS site. The pass off of the runoff begins, the resident on the top got a ditch dug by the City (where Joe Slocum, C.M. and Bill Kelly C.A. continually state that the City is "precluded" from working on private property)  Then Legore Subdivision- Birch St is swamped and still is because it's sub division( residents apparently have some secret agreement with the City), then Cedar St gets swamped, they go to Council and got voted down. Each spent thousands in sump pumps and sending runoff to neighbors because there was no place to drain- seems it was eventually sent over to Wight St. Then Planning Board Chair Pickering isn't talking. The water comes up along side his house and double culverts were installed to bring it under Wight St and eventually down to me. Along with another dug out ditch further down the road that goes behind the Annex and to me.  Combined with Todd Rosenburg Code Enforcer refusing to cite violations for not removing plowed snow off site (and many other sites too- also a picture album on that). Allowing 10-12 sites to stock pile snow all season and melt to us. Wiping out property in thaw of 2009 and 2011 and CITY WALL HALL including Planning Board blaming MOTHER NATURE AND ACT OF GOD!! THEY ARE GOING TO BURN IN A FIRE PIT IN HELL FOR THAT!  Then we have the planning board- with Diane Allmyer Beck- WCGH Annex fraud, it just never ends. I have only been here 3 years and have uncovered only the tip of the corruption- ALONE.

4/16/12 City Council Video http://vimeo.com/moogaloop.swf?clip_id=40581849 ff exactly 20:45 minutes in I speak for 2 minutes of documented corruption and inflicted ignorance. Police presence ordered again, by Council/Manager to intimidate me? I tell them that the new annex building is illegally draining into my property. Because of my concerns of runoff from the proposed annex addition, a site visit was ordered. Diane Allmyer Beck made sure to stand at the point of annex runoff entering into stream, behind 5 and 11 Seaview Terrace (any runoff is illegal because I have proved it is not a natural outlet but is a manmade drainage ditch.  8 months later, construction is complete and it is draining to my property and no one will speak or investigate. I am advised to give $250 to file an appeal with the Zoning Board of Appeals from City Planner Wayne Marshall.

 







Picture with green drain pipe, is the stormwater path that Diane Allmayer Beck stood at and approved during the Planning Board Site Visit 6/2011, prompted because of my stormwater letter of concerns for resident input. This exit of stormwater into the stream is at 5 and 11 Seaview. Wayne Marshall and Mike Hogan did not comply with approved path and unethically and illegally have made their own unapproved plans. The approved path seen here is almost dry after 2 inches of rainfall on 4/23/12 @ 1pm.



This picture, with the yellow tape tied to a tree, is where the stormwater is pouring(from the north east) into stream from the Annex on 4/23/12 @ 1 pm. This is at 17 (my property) and 11 Seaview, unapproved and undisclosed- hidden from the Planning Board. It merges with the flow from the northwest. A huge tree on my property now has more than half of it's root system exposed from the erosion of merging.

Joe Slocum said appeals was over one month after site visit (in 6/11- construction didn't even begin until 12/11)

At the street meeting for flooding of Seaview in 8/2011 I previously requested the specific plans for the stormwater draining of the annex. The plans Mike Hogan sent me did not reflect any specifics on stormwater paths. I spoke with him at the meeting, laid out the plans and visually showed him the site of exit when we were in the back yards of 11 and 5 Seaview. He confirmed that it would be draining there as approved.

One month later, I saw this hidden, undisclosed, unapproved stormwater path draining from the Annex to my property. Gary Haslam- WCGH, Project Manager, Mike Hogan- Architect for Annex, and Wayne Marshall- City Planner, have not complied to the site visit approvals and are refusing to admit and fix.

Wayne Marshall is full steam ahead in this corruption, telling me to go to the Zoning Board and start with paying $250 to appeal (another resident was set up by Wayne, shat Wayne did to them was illegal but after 10 thousand dollars in fighting him, they are broke and trying to sell their home. That was our tax dollars used for Wayne's defense with our City Attorney and employees.

I have asked over and over to have Diane Allmayer Beck confirm her approvals, no response. Wayne Marshall says it is not appropriate to involve Daine Allmayer Beck, THE CHAIRWOMAN OF THE PLANNING BOARD!!!


No comments:

Post a Comment